|
|
Email
Print
|
|
|
PIG® BUILD-A-BERM® Barrier Corner
#PLR279
|
|
|
|
 |
|
|
|
|
|
|
|
|
Join two 1.5" H BUILD-A-BERM® sections at a 90-degree angle.
Show Details...
Contain leaks and spills around your machinery without building expensive cement curbs or cutting and installing angle iron. These Corner sections allow you to join two 1.5" H BUILD-A-BERM® sections at a 90° angle. - Made of pliable closed-cell foam, so the Corner springs back into shape after you walk on it or roll over it with light, wheeled equipment (Driving over it with heavy equipment or forklifts is not recommended)
- Durable all-vinyl covering resists oils, coolants and most chemicals
- Simple installation; fit pieces together, secure to floor with silicone caulking and seal seams with PVC cement (caulking and cement not included)
|
|
Color:
|
Yellow
|
|
Dimensions:
|
11" L x 4.5" W x 1.5" H
|
|
Sold as:
|
2 per box
|
|
Weight:
|
1.40 lbs.
|
|
New Pig Patent:
|
5,820,297
|
|
# per Pallet:
|
36
|
|
Composition:
|
18 oz. Vinyl-Coated Fabric w/ a Closed Cell Polyethylene Foam Core
|
|
|
|
Technical Documents |
|
Product Data Sheet (PDS)
|
|
|
Chemical Compatibility for PIG® Build-A-Berm® Barriers
|
|
|
Regulations and Compliance |
|
40 CFR 112.7
-
SPCC planning requirements state that facilities subject to these regulations must have written plans in place discussing the products, countermeasures and procedures that are in place, or will be taken by the facility to prevent discharge of oil into waters of the United States.
|
|
40 CFR 122.26
-
When applying for a National Pollutant Discharge Elimination System (NPDES) permit, facilities must have a plan in place that describes actions, procedures, control techniques, management practices and equipment available to prevent illegal discharge of pollutants into waterways.
|
|
|
|
There are no known warnings and restrictions for this product. |
|
|
Back to Top
|
|
|
|