Skip to content Skip to navigation menu

PIG® Build-A-Berm® Barrier Bladder Section

For Smooth Surfaces; Non-Weight Bearing, Glued In Place Barrier, 7.25" x 44" x 4"
Add this special bladder section to your 4" Build-A-Berm system for additional containment capacity - without increasing your footprint or wall height.  Read More 

PRICING (Based on quantity)

1+
$256.00

Description

Add this special bladder section to your 4" Build-A-Berm system for additional containment capacity - without increasing your footprint or wall height.
  • Bladder expands to provide 55 gallons of containment in addition to the capacity of your 4"H Build-A-Berm system
  • Helps you meet containment regs without increasing the footprint or wall height of your barrier system (bladder deployment requires an area of 66" x 58")
  • Build new or retrofit your existing 4"H Build-A-Berm system; secure to floor with Sili-Thane sealant (PTY340), then seal seams with Industrial-Strength Vinyl Cement (PTY105)
  • Durable, 18 oz. all-vinyl covering resists oils, coolants and most chemicals
  • Black color identifies bladder section between standard yellow sections
  • Clearly labeled to remind workers not to walk on, drive over or block flap where bladder deploys
  • Easy removal requires only a flat-bladed shovel
  • Great for use around leak-prone areas where you can't expand the Build-A-Berm footprint into aisles

Specifications

Color Black
Dimensions 7.25" W x 44" L x 4" H
Barrier Type Vinyl Build-a-Berm
Bladder Volume 55 gal. Bladder
Bladder Dimensions Deployed 66" L x 58" W Bladder Footprint
Install/Deploy Type Glued In Place Barrier
Intended Use For Smooth Surfaces; Non-Weight Bearing
Temperature Limit Works from -22°F to 160°F
Sold as 1 each
Weight 5.1 lbs.
New Pig Patent 9,181,669
# per Pallet 50
Composition Cover - 18 oz. PVC Bladder - Polyethylene Bladder Compartment - Acrylic Resin
UNSPSC 24101907
Pigalog® Page Number Page 186

Reviews

Additional Information

  • White paper – Should I be Worried about SPCC? 8 Things you need to know.
  • 40 CFR 112.7
    SPCC planning requirements state that facilities subject to these regulations must have written plans in place discussing the products, countermeasures and procedures that are in place, or will be taken by the facility to prevent discharge of oil into waters of the United States.
  • 40 CFR 122.26
    When applying for a National Pollutant Discharge Elimination System (NPDES) permit, facilities must have a plan in place that describes actions, procedures, control techniques, management practices and equipment available to prevent illegal discharge of pollutants into waterways.
  • 40 CFR 264.175
    Hazardous waste containment systems must be free of structural cracks or gaps, be designed to keep spilled liquids from remaining in contact with the container, prevent run-on and "have sufficient capacity to contain 10% of the volume of the containers, or the volume of the largest container, whichever is greater."