For Calm Water & Low Current 100' L x 10" H 6" Draft Dimensions

Non-absorbent floating boom quickly contains oil spills and small debris in swamps or calm, shallow waters.
Read More >


Risk-Free Guarantee

PRICING (Based on quantity)

1

$1,861.00

2 +

$1,778.00
(Best Value)

Purchase by the pallet — Save on freight!  |  # per Pallet: 4

$1,861.00

Non-absorbent floating boom quickly contains oil spills and small debris in swamps or calm, shallow waters.

  • Round, closed-cell polyethylene flotation cylinders contain oil and debris up to 4" above water line
  • Skirting barrier hangs 6" below water line to keep pollutants from creeping under
  • Galvanized steel chain runs length of boom to add weight and rigidity
  • Heavy-duty, 22-ounce vinyl-coated polyester with welded seams resists UV in regular outdoor use
  • Link units using marine-grade aluminum universal slide connectors and attached toggle pins
  • Polypropylene handle/anchor point allows easy one-person deployment from barges, boats, trailers, docks or shore
  • High-visibility yellow speeds recognition in emergencies
  • Conforms to OPA-90 specifications
  • Cleans easily using detergent, steam or power washing
  • Easy to transport and store
  • Add PIG Oil-Only Booms to absorb petroleum-based pollutants
  • Need a custom boom? Call 1-800-HOT-HOGS (468-4647)

Break Strength 1,800 lb.
Style Non-Absorbent Boom
Dimensions 100' L x 10" H
Application Spill Response on Water
Brand Elastec American Marine
Current Type Calm Water & Low Current
Color Yellow
Draft Dimensions 6"
Freeboard Dimensions 4"
Ideal For Streams, Canals, Drainage Ditches, Swamps
Sold as 1 each
Weight 96 lbs.
# per Pallet 4
Composition Boom: PVC
Chain: Galvanized Steel
UNSPSC 24101907
Pigalog® Page Number Page 187

  • Product Data Sheet (PDS)
  • 33 CFR 154.1040
    Facilities transferring materials that could cause substantial harm to the environment must have at least 200 feet of containment boom available within one hour of a spill, and suitable quantities of absorbent materials available within two hours of a spill.
  • 40 CFR 112.7
    SPCC planning requirements state that facilities subject to these regulations must have written plans in place discussing the products, countermeasures and procedures that are in place, or will be taken by the facility to prevent discharge of oil into waters of the United States.
  • 40 CFR 122.26
    When applying for a National Pollutant Discharge Elimination System (NPDES) permit, facilities must have a plan in place that describes actions, procedures, control techniques, management practices and equipment available to prevent illegal discharge of pollutants into waterways.
 

Reviews

1 2 3 4 5
Cancel
  • star star star star star By Joanne 01/24/2019

    Multiple uses

    "We purchased this product for our municipal sewer ponds. It has been great in helping control the weeds that grow on the top of the ponds. It is not the conventional use for it but, does a great job. We put it on the ponds and pull it so the weeds are at one end of the ponds. The bacteria that breaks down things in the ponds needs light and air. The weeds were not allowing this and now we can have some control over it. Also, wanted to mention the great customer service when ordering."


Sign Up for PIG Deals

Score incredible offers, insightful info, cool promos, handy tips and more!

Thank You!

You're signed up! Keep an eye out for exclusive promos sent to your inbox.