Super Swamp Boom
For Calm Water & Low Current 25' L x 10" H 6" Draft Dimensions
Non-absorbent floating boom quickly contains oil spills and small debris in swamps or calm, shallow waters.
Read More >
PRICING (Based on quantity)
1
$690.00
2 +
$658.00
(Best Value)
Non-absorbent floating boom quickly contains oil spills and small debris in swamps or calm, shallow waters.
- Round, closed-cell polyethylene flotation cylinders contain oil and debris up to 4" above water line
- Skirting barrier hangs 6" below water line to keep pollutants from creeping under
- Galvanized steel chain runs length of boom to add weight and rigidity
- Heavy-duty, 22-ounce vinyl-coated polyester with welded seams resists UV in regular outdoor use
- Link units using marine-grade aluminum universal slide connectors and attached toggle pins
- Polypropylene handle/anchor point allows easy one-person deployment from barges, boats, trailers, docks or shore
- High-visibility yellow speeds recognition in emergencies
- Conforms to OPA-90 specifications
- Cleans easily using detergent, steam or power washing
- Easy to transport and store
- Add PIG Oil-Only Booms to absorb petroleum-based pollutants
- Need a custom boom? Call 1-800-HOT-HOGS (468-4647)
Break Strength | 1,800 lb. |
Style | Non-Absorbent Boom |
Dimensions | 25' L x 10" H |
Application | Spill Response on Water |
Brand | Elastec American Marine |
Current Type | Calm Water & Low Current |
Color | Yellow |
Draft Dimensions | 6" |
Freeboard Dimensions | 4" |
Ideal For | Streams, Canals, Drainage Ditches, Swamps |
Sold as | 1 each |
Weight | 24 lbs. |
# per Pallet | 16 |
Composition |
Boom: PVC Chain: Galvanized Steel |
UNSPSC | 24101907 |
Pigalog® Page Number | Page 187 |
- Product Data Sheet (PDS)
-
33 CFR 154.1040
Facilities transferring materials that could cause substantial harm to the environment must have at least 200 feet of containment boom available within one hour of a spill, and suitable quantities of absorbent materials available within two hours of a spill. -
40 CFR 112.7
SPCC planning requirements state that facilities subject to these regulations must have written plans in place discussing the products, countermeasures and procedures that are in place, or will be taken by the facility to prevent discharge of oil into waters of the United States. -
40 CFR 122.26
When applying for a National Pollutant Discharge Elimination System (NPDES) permit, facilities must have a plan in place that describes actions, procedures, control techniques, management practices and equipment available to prevent illegal discharge of pollutants into waterways.
Reviews
-
Excellent Quality!
"I ordered this boom to replace an old, defective boom at a runoff water oil/water separator at an industrial site. This boom was directly interchangeable to the existing boom (different brand). This made my job easier as no modifications of the existing brackets were necessary. The yellow vinyl appears very thick and durable which is what I wanted for prolonged outdoor use. I will definitely be ordering this product again."
-
Super Swamp Booms
"Thanks New Pig: I received my Super Swamp Boom promptly after placing my internet order. Browsing the New Pig webpage for this particular product was fast & easy. During shipment, I received several emails informing me about processing/shipment. Also, installation of the boom was simple, and the quality & craftsmanship of the product is superior. Product information/pictures were readily available which helped me determine if this product was truly what i needed. In fact, my co-workers liked what they saw, so i purchased another one."
Sign Up for PIG Deals
Score incredible offers, insightful info, cool promos, handy tips and more!
Thank You!
You're signed up! Keep an eye out for exclusive promos sent to your inbox.